Astuna Metal

QUICK LINKS

B25 GLASS BASE SYSTEM

Thickness
Length
Height
0 +5
0
0
0 +6
0
0
0 +8
0
0
0 +10
0
0

01

Certificates

Please take a moment to click on the specified button to access and thoroughly review the presented certificate.

02

Quality

Please take a moment to click on the specified button to access and thoroughly review the presented quality.

03

Catalogue

Please take a moment to click on the specified button to access and thoroughly review the presented catalogue.

Astuna Metal

B25 Glass
Base System

According to the Loads standards TS498, DIN 1055 , and
AA-ASD-2000 Aluminum design code standards
The result of calculation reports and tests made with
Linear Gcam Calculation for the Base:
(62.3 kg / meter) x 6 meters / 1.2 meters = 311,5 kg/m
According to the results of the static analysis, the maximum
deflection condition was met.
The max deflection of the base is 0.60 mm
The maximum deflection of the glass is calculated as 10,325 mm.

80-1040 - GLASS BASE

 80-1010 - TIGHTENING WEDGE SET

80-1013 / 80-1014

10-12 / 16-20mm

GLASS WICK

80-1008 - GLASS WICK

80-1042 - SIDE COVER

17-3004 - HEGZAGON SCREW

Benefits of Glass Base Advantages
Movable Glass
Different Glass Weights
Aesthetic Design
Flexible Usage Areas
Easy Installation
High Durability

<----------125 CM---------->

<---------------------250 CM---------------------->

<-------125 CM------->

<-14 CM->

<-14 CM->

<-14 CM->

<-----42 CM----->

<----42 CM---->

Add Your Tooltip Text Here

B25 GLASS BASE STATIC ANALYSIS

(62.3 kg / meter) x 6 meters / 1.2 meters = 311,5 kg/m

0 MM
The max deflection
of the base is
0 MM
The maximum deflection of
the glass is calculated as

Products

80-1040 I GLASS BASE

80-1041 I GLASS BASE CORNER

80-1042 I SIDE COVER

80-1010 I TIGHTENING WEDGE SET

80-1008 I GLASS WICK

80-1013 I GLASS WICK

80-1014 I GLASS WICK

INQUIRY FORM

Fill out the form to get a price quote. Our team will get back to you within 24 hours.